Bridge engineering

Guangdong Kaiyang Expressway

The A12 section of Kaiyang Expressway in Guangdong started construction in 2000 and opened to traffic in 2004. Two-way four lanes, the design speed of 120 km per hour, the whole section of the main line 6.6 km, including Enping Da Huai interchange 3.2 km.

Copyright © 2002-2021  ICP 20128888